Six 600Mm Diameter Tubular Steel Piles Were Driven on Each Side to Support the New Galvanised Steel Substructure Which Was Built Up Before the Decayed Timber Was Cut Away
Six 600mm diameter tubular steel piles were driven on each side to support the new galvanised steel substructure which was built up before the decayed timber was cut away..
View image in PDF (9.94Mb)